Harcourt Street railway line

Harcourt Street Line
Legend
Harcourt Street
Ranelagh & Rathmines
Milltown
Dundrum
Stillorgan
Foxrock
Carrickmines
Shankill (DW)
To Dublin Connolly
Woodbrook
Bray
To Rosslare

The Harcourt Street railway line (Irish: Seanlíne Iarnróid Shráid Fhearchair) ran from Harcourt Street in Dublin through the southern suburbs to Bray.

Contents

History

Following the success of the Dublin and Kingstown Railway (D&KR), which opened on 17 December 1834, proposals for a second commuter railway were put forward. These plans proposed the building of a 12.5-mile (20 km) railway from Bray (opened in 1854) to initially terminate at Harcourt Road. (Harcourt Street Station was not built until 1859). The building of the line was done by two railway companies: The Dublin, Wicklow and Wexford Railway (DW&WR), who built the line from Bray to Dundrum and the Dublin, Dundrum and Rathfarnham Railway (DD&RR), who built the line from Dundrum to Harcourt Street.

On 14 February 1900, a train from Enniscorthy failed to stop and went through the buffers and the wall of the station,[1] sending debris over Hatch Street. Nobody was killed, though the driver, William Hyland, had his right arm amputated at the scene. Another serious accident occurred on 23 December 1957 when two trains collided in thick fog just south of Dundrum station. The first train had slowed to a walking pace because of a cow on the line. The second train was allowed into the same section of a track due to an error by a signalman. Its driving cab was completely destroyed in the collision and the driver, Andrew Larkin, killed instantly.[2]

In the 1950s, diesel gradually replaced steam in an effort to improve journey times as many passengers had by then forsaken the line due to a rapid and significant increase in private car ownership. CIE were also rapidly expanding their then new bus services in and around the railway.

Route

The 12.5-mile (20 km) route ran south, initially from a temporary terminus in Harcourt Road, serving the intermediate stations of Dundrum, Stillorgan, Carrickmines and Shankill. The new Harcourt Street station, still extant, opened in 1859, along with a temporary platform at Foxrock.

Further new stations followed; Milltown (1860), Foxrock (1861), Rathmines & Ranelagh (1896, renamed Ranelagh in 1921). It joined the Westland Row line at Shanganagh Junction continuing to Woodbrook Halt (1910), which served the cricket ground on Sir Stanley Cochrane's estate. The Woodbrook Golf Club later used this halt between 1920 and 1960.

One of the major engineering feats on the line was the Milltown viaduct, or Nine Arches, which still stands today over the River Dodder.

Decision to close

Following the Beddy Report of 1957, CIE began to realise that in an effort to save money, all the non-profitable rural railway branch lines would have to close. The Harcourt Street line was one of these unprofitable railway lines and so the decision to close the line was ultimately reached. In October 1958, CIE gave advance notice of the closure in the local papers. Many objections were raised by local people but to no avail. The last train left Harcourt Street at 4:25pm on 31 December 1958. One interesting event that occurred was that when this train began crossing The Nine Arches Viaduct between Milltown and Dundrum, the staff of the nearby laundry turned out in force and blew sirens as the train crossed the viaduct for the last time. Following the closure, many of the stations were sold by public auction. The tracks were lifted between 1 January 1959 and September 1960.

Legacy

The route was preserved after closure, allowing for a potential future reopening. The route corridor remained mostly in-situ until the 2000s. The section between the Grand Canal crossing and the old Stillorgan station was chosen for use by the Luas light rail system whose Green Line opened in 2004. The line crosses Dundrum on the new William Dargan cable-stayed bridge.

An extension of the Luas to Cherrywood opened for passenger service on Saturday October 16, 2010, using some of the old railway alignment.[3][4][5] The route leaves the old alignment after Sandyford Depot to Central Park stop, crosses the M50 and runs down Ballyogan Road with stops at Glencairn, The Gallops, Leopardstown Valley and Ballyogan Wood. It then crosses the M50 again, re-joining the original alignment at Racecourse (future) stop, west of Glenamuck Road. Continuing along the alignment it passes by the original Carrickmines station to Carrickmines stop and Brennanstown (future) stop. The Carrickmines stop will incorporate Park and Ride facilities, both it and Brennanstown were expected to be accessed by new roads from the M50 side. However, the RPA has announced that the Brennanstown stop will not be opened due to lack of local development.[6] Beyond Brennanstown the route crosses open countryside, diverging slightly from, but paralleling the old alignment to Laughanstown stop, Cherrywood stop and ending at Bride’s Glen stop, adjacent to Dell.

The final extension to Fassaroe[7][8] will continue on the old alignment to Loughlinstown, just 1mile (1.5 km) short of the old Shanganagh Junction, before finally leaving the old route by turning south and paralleling the M11.

Visible remains

Several bridges, stations and much of the alignment have survived. These include the Harcourt Street Station, Dundrum, Stillorgan, Carrickmines and Shankill stations, Woodbrook Halt, the Nine Arches and Bride's Glen bridges. No trace of Foxrock station appears to remain, other than the original passenger entrance to Leopardstown Racecourse beside the golf club main gates.

Trivia

See also

References

  1. ^ http://www.harcourtstreettraincrash.com/
  2. ^ http://www.railwaysarchive.co.uk/documents/Unk_Dundrum1957.pdf
  3. ^ Sandyford to Cherrywood, Line B1 info
  4. ^ Line B1 simple maps
  5. ^ Line B1 Railway Order, Environmental Impact Statement & detailed maps
  6. ^ Irish Times, 14 Nov 2009
  7. ^ Line B2 info
  8. ^ Line B2 simple map & branch line options

External links